Every reliability report, every PM review and every capital request you will ever build depends on what a technician typed when they closed a work order. If what they typed was “Fixed,” you have a problem, and no software upgrade is going to solve it.

I’ve pulled work order history at more organizations than I can count, and I see the same thing almost every time. Thousands of closed work orders, and the failure code is “Other” or blank on most of them. The long description says “Replaced part” or “Checked, OK.” Actual labor hours match the estimate to the minute. Then someone asks for the top ten bad actors in the pump fleet and nobody can answer.

Why closeout data goes bad

Don’t blame the technicians. In most cases the organization made good closeout hard and bad closeout easy:

What you need from every closeout

You don’t need a novel. You need a handful of things, captured every time:

If you can’t explain to a technician how their closeout gets used, you haven’t earned the right to ask for it.

How to fix it

Cut the failure code list down to what the crews see on the equipment they work on, by asset class. Build it with two or three senior techs in the room. Put a mobile device in the tech’s hand and close out at the asset while the details are fresh. Have supervisors review a sample of closeouts every week and send back the ones that don’t tell a story.

Most important, close the loop! Show the crew the bad actor report built from their own closeouts. When a technician sees that the notes they wrote got a chronic pump replaced, you’ll see the quality of the notes change fast.

What to do this quarter

How many of your closed work orders from last month would hold up if you had to defend a replacement with them? Have you ever checked?